(08.02.18) General cleaning of all common area of 1st floor (RW) of the building. i.e. Corridor, lift lobbies, toilets.

(08.02.18) General cleaning of all common area of 1st floor (RW) of the building. i.e. Corridor, lift lobbies, toilets.
Date: Feb 8 2018 - 17:26
100PEOPLE
02HRS EFFORT
  • Map View